Construction thread... Show off your work!

Glad to see you’re still out there hustling my man. Hope you’re still squeezing in some good home time with the family.

im flat out mate, got more work ahead than expect, probbaly not home till 14th december now.. im needed in western australia urgently after the next 2 jobs.. in negotiations now for a 4 day stop at home lol
 
You did that shit for 6 fucking hours????

its a part of my job to be honest, i jackhammer shit for a living then shotcrete it back in.. been on the hammer for the last 6 shifts (12 hour shifts) to be honest. but that one prick of a section took 6 hours.. awkward spot

man i can spend 4 weeks straight on that thing lol
 
i started formwork for the off gas hood arch last night.. got 2 panels formed up and managed to cast one

big shift 12 hours one 10min break
A2D97080-0CDF-42AC-A329-3EF1A2654087.jpeg A0D91C6E-86D5-4D19-B5EF-8C5D8B920526.jpeg F7B620C0-1C1A-4F3D-825D-688DC98D8069.jpeg C50CF13F-2379-48FB-88BF-2FE3926729A9.jpeg F4C479C2-AA0E-46A0-BCA4-13431356A254.jpeg
 
its ugly work but gota be done quick lol.. they dont care as long as they are producing copper

another massive shift... had to pull dayshifts work apart and rebuild it lol typical days VS nights bullshit

worked from 10pm till 5am non stop no break, got it done ready for a dayshift pour and now i grt a text from a dayshift lad saying they gota pull all of my work apart because there needs to be a weld inspection haha1AB43BB1-1DC9-4D6E-A7A2-341ECF06E072.jpeg1CBC9A5F-CE7D-44AE-BD46-08EFB0304B17.jpeg160275DE-8487-4479-BE8E-1877665677C9.jpeg
0054866A-C8A8-4C46-8F4C-3665B56AA9EA.jpeg
 

Attachments

  • 16B97354-EC27-4877-8F76-3C9BF64A9AA7.jpeg
    16B97354-EC27-4877-8F76-3C9BF64A9AA7.jpeg
    332.1 KB · Views: 6
@kap73 damn dude those are some serious shifts! I worked 8 last Saturday, had to remove some Batts and replace with rigid board. Hard lids are in, nothing to stand on kind of a pain I'm the ass. Still plugging away on the office building the exterior is FGRC fiber glass reinforced concrete, we are glueing stick pins to it, the surface is rough and a pain in the ass to get the pins to stick. It is going to be a nightmare to insulate as well.MVIMG_20181013_083215.jpg MVIMG_20181013_133130.jpg IMG_20181013_133046.jpg IMG_20181009_111343.jpg IMG_20181009_111355.jpg
 

Sponsors

Latest posts

Back
Top