Construction thread... Show off your work!

These ones where screwed on with self tapers. If there was concrete above we usually shoot them. I always wanted to try the welder, but have never seen them used at our shop

stud guns are good, i did some lagging on a job and used one years ago, pretty easy to use
 
These ones where screwed on with self tapers. If there was concrete above we usually shoot them. I always wanted to try the welder, but have never seen them used at our shop

stud guns are good, i did some lagging on a job and used one years ago, pretty easy to use aswell
 
we are into the rythym now, both shifts hitting a full strip (90metres) of cast per shift, setting up the next row of panels and stripping the formwork from the previous shift. all this in 11 hours then we do a kiln turn so nightshift can repeat the proccess..

its game on boys i love this shit08E70985-0EEA-4089-9C7C-EF0362DCAB76.jpeg98EBA790-8CB9-4B86-9B2A-AFE371C2FB40.jpeg EC117814-8134-4CD9-80A6-1389678A18E1.jpeg 23F9879B-C3C3-45CA-9D3D-C86B342FC08B.jpeg 34FCE212-AFE3-483C-A5D7-EB9AC6F080F6.jpeg 12120576-D9C5-4F45-A191-EE26581AE99A.jpeg
 
heres a bit of formwork for you boys, installedthis in 6 hours. i been waiting 4 weeks to do this. been getting anxiety thinking i may have messed it up. but it all went in perfect. took 9 tonne of cast and didnt leak or move one bit

nightshift formed up the second half and tried it a different way, theres moved 1 inch and leaked.. i told them to copy what i did but they dont like being told basic stuff

8C7827CA-5D7F-4BF7-8BCA-D48235811FCB.jpeg F6BC7A39-3B89-4A00-A86C-84EDED68B697.jpeg 7BAC3555-7F21-4382-B271-031A60175882.jpeg 01B7A23F-882E-47C8-9505-A85B0DC7023D.jpegB048A3E8-2576-4A47-A047-328B8C9524FE.jpeg 62E749E2-CC2C-4059-8043-18E1FBB149A7.jpeg
 
we finished the kiln yesterdayCA12D0E2-6301-4EE8-A775-5EC037560EF2.jpeg91100B14-5D46-49DA-9A93-ABF3BD0CC80D.jpeg EA924B75-B839-4D6E-B2F7-ABE7327C96ED.jpeg68CBEFBE-4158-4918-A4FC-A7264A56116A.jpeg 29CEB183-D897-4AE7-8333-92CB3EE486B2.jpeg
this has been an awesome job, now i got a 45min drive to another shutdown for another 4-5weeks, start tmoz night.. game face on
 

Attachments

  • FF438883-EAAF-4214-BE7B-5A909695894E.jpeg
    FF438883-EAAF-4214-BE7B-5A909695894E.jpeg
    309.7 KB · Views: 10
Finally on the home stretch of those office buildings. I'm working in the basement putting up some 2" rigid board with a white facing. Got 2 to do each @ 40,000 sqft. My boss is talking about sending some other guys out there. I hope he doesn't, he didn't want to give me any help when I was doing all the fucked up stuff, now I got the gravy he wants to send help. It is what it is. I gearing down my weekend work, my daughter has been really missing me, so I am going to do every other Saturday for awhile see if that helps. If not I might need to drop them all together, I am hoping not though. The time and a half is nice.IMG_20190321_085047.jpg IMG_20190321_100545.jpg IMG_20190321_100545.jpg IMG_20190321_100547.jpg IMG_20190321_085101.jpg
 
Back
Top