I've seen AM suggest that he loads for 2 weeks and deloads for 1. the 5x5 is a 4 load, 4 unload protocol. My questions regard determining the length of each phase.
What parameter(s) should one use to gauge if they are at the right length of time for that phase? For example, in the above comparison, is it AM's personal preference, experience level, or goals that caused the discrepancy? (Please don't say all of those AM) Should the loading and unloading time frames be equal?
I have many iterations of the same base question, but I'd like some pointers from those here to perhaps weed out a lot of the questions I have.
-
What parameter(s) should one use to gauge if they are at the right length of time for that phase? For example, in the above comparison, is it AM's personal preference, experience level, or goals that caused the discrepancy? (Please don't say all of those AM) Should the loading and unloading time frames be equal?
I have many iterations of the same base question, but I'd like some pointers from those here to perhaps weed out a lot of the questions I have.
-
