TankDog
Member
Mine took about 50 days or so and now it's in town.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Ok, so I received my pack today. It was shipped June first, so 21 total days, which is not bad considering all the COVID situation.
Anyways my main issue is that the Anadrol I ordered (100mg x 100tabs) was 6 pills short, many of them cracked and it was filled with powder most likely to account for the supposed weight 100 pills should have, which is bad. 6 days is a big deal for me since I will dose it at 50mg, so I basically lose 12 days of what I was supposed to get. The cracked pills I get since it could be due to transport, what I don't get is that they filled the rest with powder, I'm not happy with this.
Hi, I had the same problem as you, if you miss 6 pills, take all your powder and split it into 6. These no big deal,
Powder is from damaged pill I think.
Sent an email saying caber was missing from pack that I paid for.
After saying it was missing...
"We are out of Cabergoline sir, we are looking for some option to get some veterinary grade"
After me saying ill take HCG 10kiu (same price) instead, and asking if he has BAC water...
"We have water for injection Braun ( its water solvent, no bacteristatic )"
I sent another email saying...
Okay I'll just take the 2 hcg then. Again, assuming no caber coming in stock within the next two weeks?
And nothing.
Don't know why it's a problem sharing the 2 sentences I got from you. Got your attention now. The caber was expired on this thread. And I didn't say HGH. I said HCG.
Give me address to e-mail, will send you 6 new pills. OK for you ?
Even though it's kinda silly to send 6 pills.
So, when you share a complain about 6 pills, why is silly to re-send them sir. We have no problem with it.
toni this makes no sense at all after putting it through whatever translation programme you use, please learn english@cadafi,
This is the most expensive and this is the most time to do, economically is not good, but I believe that the new lots are with different charge agent and the problem no longer exists ...