Qingdao Sigma Chemical Co., Ltd (International, US, EU, Canada and Australia domestic

going well as always

paid on the 4th, received tracking on 11th. and he says if you received tracking its already been shipped.

maybe sending one email and one email only has worked in my favor just as chinese daddy promised
Yep, this one. To all the impatient fkers: dont be pain in the ass like me, just wait for your turn without spamming. Lesson learned by the hard way:
You've been contacting different sales for your order and wasting different people times, and you've been modifying it non stop, let's just cancel it.
This is my 7-8ish order, all of them went smoothly, it only takes one time of being an obnoxious impatient baby, you will be remembered and you will find yourself falling behind in the queue.
 
After 4 weeks of 2iu/day QSC HGH (10iu/vial), IFG-1 went from 67 ng/mL to 119. Previously IPA/CJC didn't move the number at all. I'll be titrating up to 4iu/day to try to get above median levels for my age (but still within the reference range).
 
After 4 weeks of 2iu/day QSC HGH (10iu/vial), IFG-1 went from 67 ng/mL to 119. Previously IPA/CJC didn't move the number at all. I'll be titrating up to 4iu/day to try to get above median levels for my age (but still within the reference range).
I've had some peripheral neuropathy/CTS symptoms, but I've had way worse in the past (with no HGH) and I haven't had any in the last week or two.
 
I’m truly happy with the order! Fast and high quality service and product. Can’t wait to order masteron or primo! I’m waiting for eu masteron, because I’m afraid of pip with primo. What do u suggest? Did someone experience harsh pip with primo 200? Gonna test it with jano anyway but I’m curious. Thanks in advance.
Damnnnn that's some nasty Bac water!!! Don't shoot me Tracy. I fell for it in the other thread as well.
 

Attachments

  • Screenshot_20240111_210120_Chrome.jpg
    Screenshot_20240111_210120_Chrome.jpg
    603.7 KB · Views: 162
Did Johnson & Johnson start making preworkout powders or something?
Currently using 200 mg/week of test cyp. TRT is 100 mg/week. Off and on with various other AAS compounded products.


Wasn't aware J&J was in the game lol.

How about you?
 
For me the tracking email has showed up 6 days after payment confirmation last 2 orders. Give it 3 more days

I paid and confirmed via WhatsApp 11 days ago with zero confirmation or tracking from QSC. So how many more days do you suggest I wait? I asked on WhatsApp yesterday and asked for package/vial labels for my Black Friday, that just arrived. Still no answer.
 
Almost all of what you said was valid but this is not. QSC did not give you a quote. They gave you a price sheet that did not include all the detailed business terms ... you then made up your own "quote" based on the limited information you had available, and are now arguing that QSC should honor this "quote" that you made up.

QSC will actually generate quotes - you tell him what you want and where you want it delivered, but don't include prices. He will tally everything in accordance with his own business practices (which should be on the price sheet, but aren't...they have all been stated somewhere in this thread and I've read them myself). He will then issue you an official quote to either agree to, or walk away from at your discretion.

But that's not what happened in your case. You generated your own "quote" based on partial and limited understanding of the terms. In business, this would generally be called an "internal estimate", and in my industry, estimators are assumed to do a decent job if their estimates are within +/- 20% of the final paid price. But we'd never, ever, ever rant at a vendor for failing to honor our own "internal estimate" while saying "but you need to honor your quote!!!!" My background on this: I used to both buy and design/sell/quote out systems that cost >$2 million and required 100-2000 hours of labor to configure and install. I also managed all change orders for various teams of subcontractors, both general construction and specialty groups needed for the installation of those systems.

Nit: It's "forte" or "forté", not fortay.
I have no issue with what the final price ended up being like I said I would just prefer transparency in the list. Nobody is going to read the whole thread for every protocol it should be on the list.

I'm going to take you example of the differences what we are calling quotes. I have a website which I would say is just like the list. I have my terms and conditions on my website clearly available and you are prompted to read them before checking out. Now it's on you whether you read them or not, but they are brought to your attention before ordering.

If someone sends me a list of what they want based on prices I listed I should honor it. If there are considerations that need to be considered they need to be up front. If not it's basically bait and switch. It's not like I made up the prices. If I pulled the prices out of my ass I would understand not honoring it. It's also there business if their willing to risk customers being unhappy over less than 200 dollars thats on them. Most sources I know would fix the list so it doesn't happen or square up the order and say next time you have to order domestic if available.

My main reason for bringing it up was so it can be added to the list. All of my other sources list stipulations on the list. If the stipulations would have been there I would have ordered still. My biggest problem is the lack of concern for our safety and sending packs that are not properly sealed. I think they have a lot of potential, and if the fix the small details they would hurt the business of a lot more sources than they already have.

I also was posting to possibly hel someone else not make the same mistake. It's not a big deal for me if it was I would have just not ordered.

Forte: I knew it was wrong when I looked at it but I didn't want to look for the right spelling and auto correct had no suggestions.
 

Sponsors

Back
Top